1-5 of 5
Keywords: transition section
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the The 33rd International Ocean and Polar Engineering Conference, June 19–23, 2023
Paper Number: ISOPE-I-23-030
... pipe section; According to the maximum stress of relevant components at key parts of the pipeline transition section during pipe sinking and construction, further stress and strength analysis of materials were carried out, and the maximum yield stress and tensile stress of bolts were 34.72 Mpa...
Proceedings Papers

Paper presented at the The 31st International Ocean and Polar Engineering Conference, June 20–25, 2021
Paper Number: ISOPE-I-21-3259
... faced section to widen the port entrance. Therefore, a junction section is needed to connect the vertical faced section and rubble mounded section. However, to the author knowledge, there is few research on the transitional section. different breakwater structure wave pressure junction section...
Proceedings Papers

Paper presented at the The 30th International Ocean and Polar Engineering Conference, October 11–16, 2020
Paper Number: ISOPE-I-20-1301
... upstream oil & gas long wire requirement stratum settlement residual settlement full load transition section surface settlement surcharge island foundation treatment composite foundation construction consolidation settlement sand compaction pile improvement ground elevation...
Proceedings Papers

Paper presented at the The Twenty-fifth International Ocean and Polar Engineering Conference, June 21–26, 2015
Paper Number: ISOPE-I-15-751
.... stiffness transition section offshore pipeline biological growth modeling pipe weight piping simulation geometry finite element modeling anchor finite element model specification upstream oil & gas pipeline bridle piping design element model shoreward configuration catenary pipe...
Proceedings Papers

Paper presented at the The Fifteenth International Offshore and Polar Engineering Conference, June 19–24, 2005
Paper Number: ISOPE-I-05-068
... Hoyle (30 foundations) and Scroby Sands (30 foundations). The paper includes a discussion and evaluation of design and installation of the foundations. Installation tolerances for main components, which are installed separately offshore: pile, transition section, sea access arrangement, J-tubes...

Product(s) added to cart

Close Modal