Skip Nav Destination
Close Modal
Update search
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
NARROW
Peer Reviewed
Format
Subjects
Article Type
Date
Availability
1-3 of 3
Keywords: tendon system
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Proceedings Papers
Coupled Response of a TLP And Tendon System In Time Domain
Available to Purchase
Paper presented at the The Twenty-first International Offshore and Polar Engineering Conference, June 19–24, 2011
Paper Number: ISOPE-I-11-288
... effects between a moored structure and its mooring system in general followed the similar approach (de Kat and Dercksen (1994); Ran and Kim (1997); Ormberg and Larsen (1997); Ran et al. (1998); Ormberg et al., 1998). tendon riser offshore heave order disp tendon system subsea system order...
Proceedings Papers
A Deepwater Dry-Tree GoM Solution: The FourStar TLP
Available to Purchase
Paper presented at the The Eighteenth International Offshore and Polar Engineering Conference, July 6–11, 2008
Paper Number: ISOPE-I-08-351
... to increased stability for quayside integration, wet tow of the integrated system, and self- supported installation. Furthermore, the large keel footprint of the hull maximizes the efficiency of the tendon system. In order to enable quayside integration of the 22,000 ton topsides onto the FourStar hull...
Proceedings Papers
Reliability Analysis of Tension Leg Platforms By Domain Crossing Approach
Available to Purchase
Paper presented at the The First International Offshore and Polar Engineering Conference, August 11–16, 1991
Paper Number: ISOPE-I-91-014
...-called tendons, are secured ta the pile-anchored templates on the seafloor. The excessive buoyancy of the platform maintains tension in the tendons so that the tendons never go to slack under all loading conditions in which the structure may encounter during the service life time. The tendon system...