Skip Nav Destination
Close Modal
Update search
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
NARROW
Peer Reviewed
Format
Subjects
Article Type
Date
Availability
1-8 of 8
Keywords: reassessment
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Proceedings Papers
Paper presented at the The Twelfth International Offshore and Polar Engineering Conference, May 26–31, 2002
Paper Number: ISOPE-I-02-012
... of the nonlinear problem. The main objective is to obtain an accurate and computationally efficient numerical tool for the investigation of the behaviour of three-dimensional frames in general, with special attention on the reassessment of existing fixed platforms for offshore oil exploitation. INTRODUCTION...
Proceedings Papers
Paper presented at the The Eleventh International Offshore and Polar Engineering Conference, June 17–22, 2001
Paper Number: ISOPE-I-01-424
... of the more recent regulations to be reconsidered using a risk-based methodology. This approach may be constrained by the original design and operational history and, unlike new installations, the opportunity for any further risk control is limited mainly to improved operational procedures. The reassessment...
Proceedings Papers
Paper presented at the The Eleventh International Offshore and Polar Engineering Conference, June 17–22, 2001
Paper Number: ISOPE-I-01-415
... used, and to discuss their associated advantages and disadvantages. Aspects requiring further development are highlighted. INTRODUCTION Wave impact on the topside is a central issue in the need for reassessment of fixed offshore platforms around the world (Gudmestad and Hansen, 2000). This need...
Proceedings Papers
Paper presented at the The Seventh International Offshore and Polar Engineering Conference, May 25–30, 1997
Paper Number: ISOPE-I-97-397
... ABSTRACT Recent developments in reliability analysis to aid structural design and reassessment during use as well as inspection planning are reviewed. Data and methods applied to calculate the probability of ultimate and fatigue failure of structural components and systems, considering...
Proceedings Papers
Paper presented at the The Sixth International Offshore and Polar Engineering Conference, May 26–31, 1996
Paper Number: ISOPE-I-96-313
... ABSTRACT Damaged members, new deck facilities, aging and extending the design life are some examples of problems in the daily life of the existing platforms. In all these cases the structural system strength must be reassessed in order to verify if the requirements with respect...
Proceedings Papers
Paper presented at the The Fifth International Offshore and Polar Engineering Conference, June 11–16, 1995
Paper Number: ISOPE-I-95-342
... ABSTRACT: Reassessment of installations on the UK Continental Shelf is an important control measure in assuring continuing structural integrity. At present this is achieved via the certification process. Risk based regulations have now been introduced requiring a safety case for each...
Proceedings Papers
Paper presented at the The Fifth International Offshore and Polar Engineering Conference, June 11–16, 1995
Paper Number: ISOPE-I-95-347
... 1.0 Abstract: This paper describes in detail the methodology used for the reassessment of offshore installations on the Dutch Continental Shelf. The service life extension of four platforms, operated by Elf Petroland b.v., has formed the basis for the development and implementation...
Proceedings Papers
Paper presented at the The First International Offshore and Polar Engineering Conference, August 11–16, 1991
Paper Number: ISOPE-I-91-222
..., or the functional loads must be reduced. fshorlt strrlst1tuc trondheim increment hydraulic fracturing reassessment load domain strength plasticity deformation shakedown analysis plastic deformation displacement upstream oil & gas design condition cyclic nontlnekr fem skallerud criterion...