Skip Nav Destination
Close Modal
Update search
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
NARROW
Peer Reviewed
Format
Subjects
Article Type
Date
Availability
1-17 of 17
Keywords: installation process
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Proceedings Papers
Paper presented at the The 33rd International Ocean and Polar Engineering Conference, June 19–23, 2023
Paper Number: ISOPE-I-23-188
... pipeline drag anchor trajectory installation process china government anchor installation trajectory impact response upstream oil & gas offshore pipeline displacement installation global displacement asia government pipeline model cel method anchor model subsea pipeline...
Proceedings Papers
Paper presented at the The 33rd International Ocean and Polar Engineering Conference, June 19–23, 2023
Paper Number: ISOPE-I-23-187
... ABSTRACT During the installation process, drag anchors may impact or hook with subsea pipelines buried in seabed, resulting in damage to the pipelines. The inshore subsea pipeline is often protected by a rockfill protection layer, so the pull-out trajectory of drag anchors in the rockfill...
Proceedings Papers
Paper presented at the The 32nd International Ocean and Polar Engineering Conference, June 5–10, 2022
Paper Number: ISOPE-I-22-022
... floating wind farms. In this study, a novel self-installation method for installing a new concept triple-column Spar floating wind turbine system is proposed, which not only accelerates the installation process, but also drastically reduces the associated cost. By employing the self-installation method...
Proceedings Papers
Paper presented at the The 32nd International Ocean and Polar Engineering Conference, June 5–10, 2022
Paper Number: ISOPE-I-22-055
... ABSTRACT The installation phase is a critical stage during the lifecycle of an offshore wind turbine. The technology development of bottom-fixed offshore wind turbines is more mature compared to that floating wind turbines. This paper focuses on the installation process of an offshore monopile...
Proceedings Papers
Paper presented at the The 31st International Ocean and Polar Engineering Conference, June 20–25, 2021
Paper Number: ISOPE-I-21-1212
..., China endeavors to achieve scheduling and rescheduling. However, it is not an easy task to schedule carbon neutrality by 2060 (Mallapaty 2020). Even though wind energy the offshore installation process, since it is heavily influenced by the is the fifth-largest energy source worldwide, its share...
Proceedings Papers
Paper presented at the The 30th International Ocean and Polar Engineering Conference, October 11–16, 2020
Paper Number: ISOPE-I-20-1193
...). artificial intelligence machine learning energy conservation renewable energy transition wind energy social responsibility offshore installation offshore installation process cgspn approach temporal transition offshore operation base port simulation inventory offshore wind farm weather...
Proceedings Papers
Paper presented at the The 30th International Ocean and Polar Engineering Conference, October 11–16, 2020
Paper Number: ISOPE-I-20-1194
... In this paper, an agent-based discrete event simulation model is proposed. This research considers the decommissioning process as a reverse process of the installation process. As empirical values for the decommissioning process are not available yet, the processing times and operation restrictions are derived...
Proceedings Papers
Paper presented at the The 27th International Ocean and Polar Engineering Conference, June 25–30, 2017
Paper Number: ISOPE-I-17-575
... to the installation process, an extensive test campaign is carried out at the Test Center for Support Structures in Hannover. This contribution presents the design process and preliminary results of the first phase "Analysis of diameter-effects" of the test campaign. INTRODUCTION With a market share of 97...
Proceedings Papers
Paper presented at the The 27th International Ocean and Polar Engineering Conference, June 25–30, 2017
Paper Number: ISOPE-I-17-431
... feeder concept installation site owf installation vessel restriction installation process installation cost offshore wind farm scenario sustainability installation concept base port transport vessel installation port weather restriction conventional concept sustainable...
Proceedings Papers
Paper presented at the The 26th International Ocean and Polar Engineering Conference, June 26–July 2, 2016
Paper Number: ISOPE-I-16-113
... Abstract Marine riser is a key equipment connecting subsea wellhead and sea-surface platform (ship). In Subsea Production Tree (SPT) complex installation process, the marine riser hanging to floating drilling platform (ship) on free hanging state, waiting to be moved from the sea-surface...
Proceedings Papers
Paper presented at the The 26th International Ocean and Polar Engineering Conference, June 26–July 2, 2016
Paper Number: ISOPE-I-16-386
... a challenging task. Due to the current practice of decentralized information acquisition by the supply chain partners, we investigate the impact of sharing information on the installation process of offshore wind farms by means of simulation model. Therefore relevant information items will be identified...
Proceedings Papers
Paper presented at the The Twenty-third International Offshore and Polar Engineering Conference, June 30–July 5, 2013
Paper Number: ISOPE-I-13-026
... and the offshore structure is performed to verify the safety of the installation process, as well as for reducing the dynamic response and collisions among them. control method equation subsea system amplitude proportional-derivative control strategy external force installation barge dynamic...
Proceedings Papers
Paper presented at the The Twenty-second International Offshore and Polar Engineering Conference, June 17–22, 2012
Paper Number: ISOPE-I-12-607
... With the accidents of offshore structures occurring frequently, the risk assessment of transportation, installation and operation process is becoming more and more important. In this paper, the risk assessment of transportation and installation process of jacket is presented. Firstly, the main...
Proceedings Papers
Paper presented at the The Twenty-second International Offshore and Polar Engineering Conference, June 17–22, 2012
Paper Number: ISOPE-I-12-076
... unconditionally during operation. Unlike Spars, DTP can be towed to site with the topsides integrated at quayside. Unlike TLPs, DTP can be used in ultra-deep water. This paper includes a description of the unique feature, summaries of global performance, and installation process of DTP. Through the analysis, DTP...
Proceedings Papers
Paper presented at the The Eighteenth International Offshore and Polar Engineering Conference, July 6–11, 2008
Paper Number: ISOPE-I-08-395
... by asking and answering the question; "Does the reeled installation method introduce a greater risk of failure in-service than other installation processes?" The argument is constructed by assessing each limit state, meaning the fundamental ways that a pipeline can fail (burst, collapse, fracture...
Proceedings Papers
Paper presented at the The Eleventh International Offshore and Polar Engineering Conference, June 17–22, 2001
Paper Number: ISOPE-I-01-004
... and end of the pipe-laying process. The advantages of a spool piece are among others its flexibility and the relatively simple process of reversing the installation process if necessary. This is especially important in deep waters where the cost of accessibility is high. The spool piece is fabricated...
Proceedings Papers
Paper presented at the The Sixth International Offshore and Polar Engineering Conference, May 26–31, 1996
Paper Number: ISOPE-I-96-231
... wave conditions. The installation of caissons for a breakwater is sometimes interrupted or suspended by wave conditions. During this installation process, winches are hand-operated by several operators under sometimes dangerous conditions due to the operator's proximity to the winches and wires...