Skip Nav Destination
Close Modal
Update search
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
NARROW
Peer Reviewed
Format
Subjects
Date
Availability
1-20 of 42
Keywords: completion installation and operations
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Proceedings Papers
Paper presented at the The 32nd International Ocean and Polar Engineering Conference, June 5–10, 2022
Paper Number: ISOPE-I-22-106
... in other blocks. cement chemistry completion installation and operations foamed cement slurry upstream oil & gas cement slurry cement property casing and cementing hydraulic fracturing slurry drilling fluids and materials cement formulation base slurry expandable mesh shunbei oil...
Proceedings Papers
Paper presented at the The 32nd International Ocean and Polar Engineering Conference, June 5–10, 2022
Paper Number: ISOPE-I-22-108
... environmental loads is ignored, which will lead to the entry of seawater into the gap between drilling conductor and soil and reduce the vertical bearing capacity near the mudline. drilling equipment lateral displacement wellhead diameter completion installation and operations von mise stress...
Proceedings Papers
Chao Fu, Jin Yang, Lei Li, Xinyue He, Qingfeng Wei, Minghe Zhang, Xiangji Kong, Feng Qian, Haibing Pan
Paper presented at the The 32nd International Ocean and Polar Engineering Conference, June 5–10, 2022
Paper Number: ISOPE-I-22-177
... cylinder sidewall completion installation and operations resistance frictional resistance end resistance south china sea Proceedings of the Thirty-second (2022) International Ocean and Polar Engineering Conference Shanghai, China, June 5 10, 2022 Copyright © 2022 by the International Society...
Proceedings Papers
Paper presented at the The 31st International Ocean and Polar Engineering Conference, June 20–25, 2021
Paper Number: ISOPE-I-21-1183
..., lifting velocity of ore must be predicted. Therefore, this research intended to propose a method for predicting lifting velocities of ores. artificial lift system upstream oil & gas completion installation and operations enhanced recovery metals & mining lifting velocity particle ore...
Proceedings Papers
Paper presented at the The 30th International Ocean and Polar Engineering Conference, October 11–16, 2020
Paper Number: ISOPE-I-20-1125
... to ensure the safety and reliability of deepwater wells. reservoir surveillance production monitoring drilling fluid management & disposal production control casing and cementing formation temperature deepwater well increase rate drilling fluids and materials completion installation...
Proceedings Papers
Paper presented at the The 30th International Ocean and Polar Engineering Conference, October 11–16, 2020
Paper Number: ISOPE-I-20-2185
..., strong thixotropy and high initial consistency. drilling fluid completion installation and operations upstream oil & gas substitute ocean water drilling fluid management & disposal casing and cementing ambient temperature comb-type polycarboxylate dispersant saline cement slurry...
Proceedings Papers
Paper presented at the The 29th International Ocean and Polar Engineering Conference, June 16–21, 2019
Paper Number: ISOPE-I-19-485
... simulation relative water depth perforated caisson breakwater boundary free surface velocity variation porosity breakwater wave height completion installation and operations coefficient wave steepness reflection coefficient upstream oil & gas flow in porous media 2019. International...
Proceedings Papers
Paper presented at the The 29th International Ocean and Polar Engineering Conference, June 16–21, 2019
Paper Number: ISOPE-I-19-418
... installation and operations equation experiment sst turbulence model leg motion transverse force dn direction cfd simulation Study of Drag Force Acting on Various Types of DP Jack-up Vessel Legs Nitin D Thulkar Graduate School of Engineering, Kyushu University, Fukuoka, Japan Satoru Yamaguchi...
Proceedings Papers
Visual Observation of the Pull-Out Failure Mode of Belled Type Pile in Sandy Soil and Its Evaluation
Paper presented at the The 28th International Ocean and Polar Engineering Conference, June 10–15, 2018
Paper Number: ISOPE-I-18-270
... analysis belled type pile upstream oil & gas resistance inclination angle displacement completion installation and operations model test residual pullout load belled pile inclination tip angle soil density failure angle pullout resistance image analysis penetration depth experiment...
Proceedings Papers
Paper presented at the The 28th International Ocean and Polar Engineering Conference, June 10–15, 2018
Paper Number: ISOPE-I-18-147
... outer bottom simulation result completion installation and operations stress contour rupture contact force element type simulation Numerical Simulation on Ship Grounding of Double Bottom Tankers Kai Jin, Guoqing Feng, Ying Tang, Yuhang Sun, Pengcheng Liu 1) College of Shipbuilding Engineering...
Proceedings Papers
Paper presented at the The 28th International Ocean and Polar Engineering Conference, June 10–15, 2018
Paper Number: ISOPE-I-18-679
... accelerometer data. shear strength géotechnique diameter undrained shear strength ball penetrometer upstream oil & gas uniform clay penetration free fall ball penetrometer final depth impact velocity completion installation and operations expression normalized final depth ffp...
Proceedings Papers
Paper presented at the The 27th International Ocean and Polar Engineering Conference, June 25–30, 2017
Paper Number: ISOPE-I-17-464
...-to-composite hybrid joints can be critical to the structural response under impulsive loads such as an air blast or underwater explosion. dynamic loading cohesive parameter fe model completion installation and operations strength non-perforated joint steel plate grenestedt adherend stiffness...
Proceedings Papers
Paper presented at the The 27th International Ocean and Polar Engineering Conference, June 25–30, 2017
Paper Number: ISOPE-I-17-134
.... Therefore, it is necessary to develop a less costly leak detection and location technique without downhole logging. casing and cementing application natural gas dispersion completion installation and operations reservoir surveillance helium gas well flow time diffusion production...
Proceedings Papers
Paper presented at the The 27th International Ocean and Polar Engineering Conference, June 25–30, 2017
Paper Number: ISOPE-I-17-321
... degradation completion installation and operations jardine cyclic loading load cycle pile capacity equation pile length interaction diagram simple shear test contour line compaction capacity degradation method upstream oil & gas reservoir characterization amplitude cyclic axial loading...
Proceedings Papers
Paper presented at the The Twenty-fifth International Ocean and Polar Engineering Conference, June 21–26, 2015
Paper Number: ISOPE-I-15-299
... correlation annular flow azzopardi completion installation and operations procedure prediction upstream oil & gas A Numerical Procedure to Estimate Sand Erosion in Elbows for Annular-Mist Flow Based on Film Thickness and Droplet Diameter Prediction Mingyang Liu a , Haixiao Liu a,b1 a State Key...
Proceedings Papers
Paper presented at the The Twenty-fifth International Ocean and Polar Engineering Conference, June 21–26, 2015
Paper Number: ISOPE-I-15-454
... strength damage assessment numerical analysis shear strength subsea system completion installation and operations penetration depth impact impulse drag force scenario Damage Assessment of a Free-fall Dropped Object on Sub-seabed in Offshore Operation Jonghwa Won R&D Institute, Daewoo...
Proceedings Papers
Paper presented at the The Twenty-fifth International Ocean and Polar Engineering Conference, June 21–26, 2015
Paper Number: ISOPE-I-15-854
... dimensions in sand under one-way cyclic loading in tension are presented and compared to existing interaction diagrams. loading cyclic axial loading simple shear test amplitude kirsch derivation numerical approach upstream oil & gas pile capacity completion installation and operations...
Proceedings Papers
Paper presented at the The Twenty-fifth International Ocean and Polar Engineering Conference, June 21–26, 2015
Paper Number: ISOPE-I-15-866
... and the soil flow -back mechanism. completion installation and operations mesh ultimate bearing capacity finite element analysis bearing capacity deformation penetration spudcan formulation mechanism spudcan foundation equation silty clay foundation cavity ale algorithm artificial...
Proceedings Papers
Paper presented at the The Twenty-fourth International Ocean and Polar Engineering Conference, June 15–20, 2014
Paper Number: ISOPE-I-14-359
... reservoir characterization non-dimensional velocity offshore structure numerical study upstream oil & gas annular completion installation and operations engineering tension leg platform Variations of Water Particle Kinematics With Perforated Cylinder Under Regular Waves: Numerical Studies...
Proceedings Papers
Paper presented at the The Twenty-fourth International Ocean and Polar Engineering Conference, June 15–20, 2014
Paper Number: ISOPE-I-14-080
... with environmental data, it can be concluded that big-foot rig could be operated at most of China's offshore fields in moderate weather. completion installation and operations offshore weiliang dong 1 drilling equipment suction force subsea system suction load nozzle bigfoot rig specification rig...