Skip Nav Destination
Close Modal
Update search
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
NARROW
Peer Reviewed
Format
Subjects
Article Type
Date
Availability
1-5 of 5
Keywords: operation
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Proceedings Papers
Paper presented at the The First ISOPE European Offshore Mechanics Symposium, August 20–22, 1990
Paper Number: ISOPE-E-90-056
... operations. When the surface ship changes speed, differences in the normal component of the velocity along the cable are present because of time delays in the response of the bottom of the cable to inputs at the top. The longer the cable, the greater are the delays. This creates large velocity gradients...
Proceedings Papers
Paper presented at the The First ISOPE European Offshore Mechanics Symposium, August 20–22, 1990
Paper Number: ISOPE-E-90-036
... are largely independent of water depth. The essential platform element is a buoyant tower structure which is restrained at the base by a stiff mooring system. Three (3) basic applications have been identified for the SMAC structure. These are: SMAC Production, where the SMAC structure operates as a wellhead...
Proceedings Papers
Paper presented at the The First ISOPE European Offshore Mechanics Symposium, August 20–22, 1990
Paper Number: ISOPE-E-90-042
...PlOuedlllgs of the FII st (1990) European Offshore Mechamcs SymposIUm Trondhelm, NO/way, 20-22 August 1990 Copyl/ght © 1990 by The InternatIOnal SoC/ety ofOffshO/e and Polar EngmeelS ISBN 0-9626104-4-5 USE OF RISK ANALYSIS TO VERIFY ENGINEERING OPERATIONS Ove T Gudmestad StatOiI Stavanger. Norway...
Proceedings Papers
Paper presented at the The First ISOPE European Offshore Mechanics Symposium, August 20–22, 1990
Paper Number: ISOPE-E-90-043
... operation and installation, respectively). INTRODUCTION One of the possible ways to improve the performance of footings of gravity offshore platforms is the installation of additional ribbed elements – "skirts". Their height (the depth of penetration) is determined by many factors, such as the installed...
Proceedings Papers
Paper presented at the The First ISOPE European Offshore Mechanics Symposium, August 20–22, 1990
Paper Number: ISOPE-E-90-048
... of the anchor damage to failure statistics and stressing its importance for an assessment of safety of pipelines. ship mechanics anchor stiffness operation fluke frequency anchor damage offshore pipeline scenario north sea protection cover deflection interaction deformation procedure...