Skip Nav Destination
Close Modal
Update search
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
NARROW
Format
Subjects
Article Type
Date
Availability
1-20 of 112
Keywords: installation
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
1
Sort by
Proceedings Papers
T. G. Benish, J. S, Brown, K. K. Decker, J. D. Habrial, Y. Liang, R. Manchanda, H. A. Meier, A. Solomou, K. Srinivasan, D. S. Vice
Paper presented at the International Petroleum Technology Conference, February 12, 2024
Paper Number: IPTC-23699-MS
... geology geologist reservoir surveillance reservoir characterization fracture complex reservoir production monitoring reservoir geomechanics stimulation technology conference geological subdiscipline conductive fracture depletion dimension installation experiment producer gauge seg...
Proceedings Papers
Paper presented at the International Petroleum Technology Conference, February 12, 2024
Paper Number: IPTC-23391-MS
... will present an overview of oilfield production data for using outflow autonomous devices and demonstrate their benefit in various well injection applications by optimizing the well injectivity. The devices have been installed worldwide including in the Middle East, Norway, North America and China. Like other...
Proceedings Papers
Ade Fadli, Aulia Rahman, Daniel Hadi Putranto, Cintani Kusuma Dewi, Muhammad Saeful Nurjaman, Iftikar Luthfi Ramadhan, M. Afton
Paper presented at the International Petroleum Technology Conference, February 12, 2024
Paper Number: IPTC-23547-MS
.... The installation of the venturi choke (VC) has led to a substantial improvement in oil contribution from the LQR zone, a fact confirmed through oil finger printing analysis. Notably, the LQR zone, which was theoretically unable to produce even with the smallest pump and would not contribute significantly through...
Proceedings Papers
Paper presented at the International Petroleum Technology Conference, February 12, 2024
Paper Number: IPTC-24122-MS
... saudi arabia social responsibility emission transportation novel non-metallic solution international petroleum technology conference pipe nm pipe application installation sustainability deployment footprint operation climate change steel image courtesy consumption Introduction...
Proceedings Papers
Paper presented at the International Petroleum Technology Conference, February 12, 2024
Paper Number: IPTC-24251-MS
..., installation, start up, failure dates, soaking time, run life, field, run number, equipment condition (new or re-used), equipment specifications (motor nameplate, pump, motor lead extension, etc.). Abstract Electrical submersible pump (ESP) system has been one of the major hydrocarbon artificial lifting...
Proceedings Papers
Dionisius Dewanata, Rahma Wisnu Suryantoro, Yusuf Oktoviyanto, Iwan Kurniawan, Sailin Andri, Despredi Akbar
Paper presented at the International Petroleum Technology Conference, February 12, 2024
Paper Number: IPTC-24242-EA
... for SRP (tubing pump / THM Pump) after well service and re - installed it. The challenge from using repaired tubing pump is the leakage of the pump. The authors conducted FMEA analysis to solve that p roblem. The tubing pump has a hold-down mechanism on its standing valve assembly and does not have...
Proceedings Papers
Fawaz Al-Shammari, Saad Al-Meshwet, Taibah Al-Ansari, Kholoud Al-Rasheedi, Hamad Al-Mehanna, Mohammad Al-Mousharji, Lamyaa Al-Otaibi, Mariam Al-Adwani, Yousef Al-Shemmari, Khaled Al-Jabal, Khaled Al-Enaizi, Raghuveer Tapdiya, Hazim Ayyad, AbdulAziz Al-Ajmi, Nurul Nabila Abd Manap, Ahmad Alhajji, Mourad Nebbali
Paper presented at the International Petroleum Technology Conference, February 12, 2024
Paper Number: IPTC-24248-EA
...% in majority of the wells. As of 2023, approximately 70% of the wells in the Greater Burgan Field are artificially lifted through Electrical Submersible Pumps (ESPs). All conventional ESP installations / maintenance / repair / replacements requires a workover rig. 60-70% of the workover rigs in this field...
Proceedings Papers
Paper presented at the International Petroleum Technology Conference, February 12, 2024
Paper Number: IPTC-24243-MS
... with the ports in the sleeve and minimize pressure losses. The new design was installed in the X1 well of the Ecuadorian state oil company, which was producing 2,318 BLPD with a conventional jet pump. The new pump was installed with the same nozzle-throat combination and was driven with the same hydraulic power...
Proceedings Papers
Paper presented at the International Petroleum Technology Conference, February 12, 2024
Paper Number: IPTC-24549-MS
... american petroleum institute installation pipe shield methane operator Introduction Abstract Decarbonization efforts by the energy industry have driven a strong focus on implementing corrosion-resistant non-metallic pipe technologies. Reinforced Thermoplastic Pipes (RTP) comprise a popular...
Proceedings Papers
Paper presented at the International Petroleum Technology Conference, February 12, 2024
Paper Number: IPTC-24648-MS
... (PCD, the source of the data). First, the Extraction, Transformation, and Loading (ETL) layer within Baseera was used to improve the structured data. Second, a high availability of Baseera was achieved through the installation of Tableau Server, a special type of distributed installation designed...
Proceedings Papers
Paper presented at the International Petroleum Technology Conference, March 1–3, 2023
Paper Number: IPTC-22905-EA
... the natural gas seasonal supply and demand variation. Eventually, it will enable reducing the greenhouse gas emissions by deploying numerous environmental initiatives, such as attaining lesser fugitive emissions valves, installation of flare gas recovery solution, implementation of relief valves leaks...
Proceedings Papers
Pimpisa Pechvijitra, Nuttamon Nontaphodej, Saranee Nitayaphan, Arak Yongchooyot, Warapong Moonrat, Supalap Samakkarn, Thaninthorn Wongtanapat, Nat Wutthivongthanakorn, Hatthachai Chuechamluang
Paper presented at the International Petroleum Technology Conference, March 1–3, 2023
Paper Number: IPTC-22952-EA
... Abstract One of our natural gas production fields’ production pressure has been declining due to its continuous operation since 2006. As a consequence, the installation of the booster compressor facilities is deemed as one of the key development plans to maintain natural gas production...
Proceedings Papers
Paper presented at the International Petroleum Technology Conference, March 1–3, 2023
Paper Number: IPTC-22958-EA
... Abstract The objective of the study is to investigate feasible jacket and foundation design configurations, safe and reliable methodology and technics of transportation and installation of a new reusable wellhead platform jacket to serve phased development at the initial stage. The jacket...
Proceedings Papers
Paper presented at the International Petroleum Technology Conference, March 1–3, 2023
Paper Number: IPTC-23094-MS
... in brownfields in the Upper Assam Shelf Basin and also other exploration and production (E&P) companies throughout the world. upstream oil & gas artificial lift system survey upper assam shelf basin valve gas injection operation emg installation temperature survey gas lift long cycle...
Proceedings Papers
Sarah Nabilah Ibrahim Kamal, Zulkifli B M Zin, Nur Hazrina Kamarul Zaman, M Shamir A Rahim, Eadie Azahar Rosland, Khiril Shahreza Salleh
Paper presented at the International Petroleum Technology Conference, March 1–3, 2023
Paper Number: IPTC-23020-EA
.... The evaluation on the sand control solution for Well X prioritizes remedial downhole sand control that is able to withstand highly erosive environment due to its high fluid velocity. As such, a ceramic coated Through Tubing Sand Screen (TTSS) was installed in 2021 and successfully reactivated the well to produce...
Proceedings Papers
Somsak Boonthieng, Nuntawatt Pairachavet, Witoo Soraphetphisai, Wuttipong Poungthip, Chananwath Sinthumongkhonchai, Charkorn Petcharoen, Puwadon Assadornithee
Paper presented at the International Petroleum Technology Conference, March 1–3, 2023
Paper Number: IPTC-22715-MS
... Abstract Wellhead Platform AWP-26 was originally developed under PTTEP Arthit Phase 2C, completed installation in 2014 and started a production from 2016 to serve gas plateau and to sustain the Arthit production. Upon depletion of AWP-26 in 2019, PTTEP Arthit Asset realized the opportunity...
Proceedings Papers
Navakorn Sayatanan, Sataporn Petchpong, Thamonwan Kittithornkul, Juthaporn Charoenphol, Apichart Whungkhunnatham, Santi Thuengsripan, Somchai Ploiriang, Phitsanusak Insuk, Nopharut Laopornpichayanuwat, Manisa Sangwattanachai, Mahapon Toungsetwut, Danai Srijunngam, Manit Aimcharoenchaiyakul, Ekkalak Somroop
Paper presented at the International Petroleum Technology Conference, March 1–3, 2023
Paper Number: IPTC-22740-MS
.... The offshore execution began with preparation steps which include tank offloading, heading control system, pre-installation visual survey, before comingling to operate one riser hose and flushing another. Then, the 5 days operation per hose to disconnect, replace the newly hose. After leak test...
Proceedings Papers
Yeek Huey Ho, Siti Rodhiah Fazilah, Jesus Nava Bastidas, Amirul Adha Amsidom, Eadie Azahar Rosland, Khairul Nizam Idris, Rahim Masoudi, Kukuh Trjangganung, Zahrah Mohd Khair, Mohamad Syafiq majid, Ahmad Nabil Subandi, Tharushana Chandaran
Paper presented at the International Petroleum Technology Conference, March 1–3, 2023
Paper Number: IPTC-22792-MS
... artificial lift system united states government drillstem/well testing evaluation malaysia government iptc-22792-ms installation consideration recovery esp esp replication shifting focus esp installation enhance well productivity gvf Introduction Increasing number of matured brown...
Proceedings Papers
Paper presented at the International Petroleum Technology Conference, March 1–3, 2023
Paper Number: IPTC-22813-EA
... Abstract A Dual ESP system is a redundant ESP concept that provides backup ESP system to be put on stream immediately if the primary ESP fails, which minimizes workover ESP replacement requirements and cost. An enhanced Dual ESP system for a harsh environment is installed to prolong ESP run...
Proceedings Papers
Dat Le Quang, Dong Hoang Ngoc, Manisa Rangponsumrit, Phruettiphan Supalasate, Khanh Dong Ngo, Duy Hung Nguyen, Minh Dung Tran, Van Tam Ho, Chi Luong Van, Samad Ali, Sarjono Tasi Antoneus, Osama Hasan Khan, Sing Kiet Hii
Paper presented at the International Petroleum Technology Conference, March 1–3, 2023
Paper Number: IPTC-22883-MS
... and improve production was evaluated by installation of additional surface equipments such as booster pump and compressor. In general, the integrated model provides critical insights to the field development planning, evaluation for de-bottle necking surface system and production optimization. There is lack...
1