Skip Nav Destination
Issues
On the Mechanical Stability of lnclined Wellbores
SPE Drill & Compl 11 (02): 67–73.
doi: https://doi.org/10.2118/28176-PA
Egypt's First Subsea Completion: A Gulf of Suez Case History
SPE Drill & Compl 11 (02): 80–84.
doi: https://doi.org/10.2118/29832-PA
New Electromagnetic Surveying/Ranging Method for Drilling Parallel Horizontal Twin Wells
SPE Drill & Compl 11 (02): 85–90.
doi: https://doi.org/10.2118/27466-PA
Operator/Contractor Teamwork is the Key to Performance Improvement
SPE Drill & Compl 11 (02): 98–103.
doi: https://doi.org/10.2118/29333-PA
A 3D Analysis of a Bottomhole Assembly Under Large Deflection
SPE Drill & Compl 11 (02): 104–110.
doi: https://doi.org/10.2118/28288-PA
Designing and Qualifying Drill Strings for Extended Reach Drilling
SPE Drill & Compl 11 (02): 111–117.
doi: https://doi.org/10.2118/29349-PA
Advertisement
Email alerts
Advertisement
Advertisement