Skip Nav Destination
Close Modal
Update search
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
NARROW
Peer Reviewed
Format
Subjects
Article Type
Date
Availability
1-5 of 5
Keywords: tunnel alignment
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Proceedings Papers
A Markovian Rock Mass Quality Q-Based Prediction Model for Tunneling
Available to PurchasePublisher: American Rock Mechanics Association
Paper presented at the 52nd U.S. Rock Mechanics/Geomechanics Symposium, June 17–20, 2018
Paper Number: ARMA-2018-749
... Oil & Gas project management risk assessment risk and uncertainty assessment machine learning risk management information markovian rock mass quality probability geological parameter transition intensity matrix construction Markov process tunnel alignment prediction model borehole...
Proceedings Papers
Quantifying Rockmass Behavioral Uncertainty for Geotechnical Baseline Reports
Available to PurchasePublisher: American Rock Mechanics Association
Paper presented at the 48th U.S. Rock Mechanics/Geomechanics Symposium, June 1–4, 2014
Paper Number: ARMA-2014-7489
... parameters, rockmass classification systems, or a limited number of domains along the tunnel alignment, all of which do not adequately capture the variability in the actual rockmass behavior. This paper presents a new method of incorporating the expected rockmass behavior along a tunnel alignment, where...
Proceedings Papers
Emergency Sinkhole Mitigation and Void Investigation of Abandoned Railroad Tunnel along U.S. 24, Tennessee Pass, Colorado & ndash; Case Study
Available to PurchaseK. Hanna, S. Hodges, J. Nolte, J. Elsen, R. Goodrich, M. Figgs, D. Thomas, T. Szynakiewicz, M. Vessley
Publisher: American Rock Mechanics Association
Paper presented at the 47th U.S. Rock Mechanics/Geomechanics Symposium, June 23–26, 2013
Paper Number: ARMA-2013-328
... of open tunnel along U.S. 24. Reservoir Characterization tunnel alignment knowledge management Upstream Oil & Gas mitigation grout original tunnel sinkhole ground transportation highway alignment highway rail transportation Railroad Tunnel perspective view emergency sinkhole...
Proceedings Papers
Rock Mass Analysis And Support Measures For the No Business Creek Tunnel Project, Gwinnett County, Georgia (A Case Study)
Available to PurchasePublisher: American Rock Mechanics Association
Paper presented at the 44th U.S. Rock Mechanics Symposium and 5th U.S.-Canada Rock Mechanics Symposium, June 27–30, 2010
Paper Number: ARMA-10-401
... for tunnels with similar geologic settings. reservoir geomechanics tunnel alignment groundwater gneiss structural geology biotite seam gwinnett county support measure alignment Upstream Oil & Gas shear zone saprolite zone excavation friction angle Reservoir Characterization...
Proceedings Papers
The Rock Mass Characteristics Of The Rocky Mountain Pumped Storage Project Hydroelectric Tunnel And Shaft
Available to PurchasePublisher: American Rock Mechanics Association
Paper presented at the The 27th U.S. Symposium on Rock Mechanics (USRMS), June 23–25, 1986
Paper Number: ARMA-86-0961
... investigations were completed in 1980. During this period, detailed geological work was performed to determine the geological conditions which would affect the design and construction of the project. During 1965, two deep borings were drilled along a proposed tunnel alignment to determine the general geology...