1-4 of 4
Keywords: completion equipment
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the 55th U.S. Rock Mechanics/Geomechanics Symposium, June 18–25, 2021
Paper Number: ARMA-2021-1244
... for any completion strategy is sand production across the life of a reservoir. If not managed appropriately, sand production will damage completion equipment and will lead to avoidable interventions or even premature well abandonment, both of which dramatically outweigh any upfront cost savings...
Proceedings Papers

Paper presented at the 55th U.S. Rock Mechanics/Geomechanics Symposium, June 18–25, 2021
Paper Number: ARMA-2021-2012
... on stochastic Markovian model to predict the reliability level of main integrity drilling and completion equipments, investigating the influence of operational conditions in the failure rate and providing a framework to promote a reliability growth analysis when researching new equipments. This work also...
Proceedings Papers

Paper presented at the 52nd U.S. Rock Mechanics/Geomechanics Symposium, June 17–20, 2018
Paper Number: ARMA-2018-382
... that the double helix tubing string can greatly improve sands carrying capacity and avoid sands deposition in horizontal fracturing well. Directional Drilling chemical additive flow rate Drag Force double helix completion equipment inner diameter horizontal acceleration coefficient drilling...
Proceedings Papers

Paper presented at the 44th U.S. Rock Mechanics Symposium and 5th U.S.-Canada Rock Mechanics Symposium, June 27–30, 2010
Paper Number: ARMA-10-398
... on the formation [5], and in extreme instances the wellheads have been left protruding in the air after the surface subsided [6]. reservoir geomechanics displacement Upstream Oil & Gas scenario 1 completion equipment compaction relative displacement Differential Displacement axial load scenario...

Product(s) added to cart

Close Modal