1-9 of 9
Keywords: bolt length
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the 49th U.S. Rock Mechanics/Geomechanics Symposium, June 28–July 1, 2015
Paper Number: ARMA-2015-503
... is for human access). The support recommendations tables give the following recommendations: Tensioned systematic bolting of expanding shell type since the rock mass is not of very poor quality. While the tables suggest a bolt length of 1-1.5m, it is safer to use 2m bolt length which is nearer to the rule...
Proceedings Papers

Paper presented at the 49th U.S. Rock Mechanics/Geomechanics Symposium, June 28–July 1, 2015
Paper Number: ARMA-2015-685
.... subsurface corrosion well integrity variation strength acoustic emission cumulative count corrosion process flowline corrosion situ bolt length acoustic emission method medfouni specimen evaluation rock bolt length materials and corrosion probability pipeline corrosion riser corrosion...
Proceedings Papers

Paper presented at the 48th U.S. Rock Mechanics/Geomechanics Symposium, June 1–4, 2014
Paper Number: ARMA-2014-7423
... load test, moisture sensitivity test, RQD test results. The rock within the bolted interval above the roof is divided into rock units. Three bolt lengths of 0.9 m (3 ft 1.4 m (4.5 ft and 1.8 m (6 ft.) were assumed as part of roof control plan in the analyses. Figures 1 to 3 show the wet CMRR within...
Proceedings Papers

Paper presented at the The 32nd U.S. Symposium on Rock Mechanics (USRMS), July 10–12, 1991
Paper Number: ARMA-91-791
... Wellbore Design displacement critical strain Reservoir Characterization elastic zone shear strain Upstream Oil & Gas platform discontinuity trapdoor excavation reservoir geomechanics model test rock bolt Displacement Measurement determination Rock Mech bolt length stability...
Proceedings Papers

Paper presented at the The 30th U.S. Symposium on Rock Mechanics (USRMS), June 19–22, 1989
Paper Number: ARMA-89-0943
... = ( ,) B 100 where, B is the roof span. Step 4: Calculation of the design parameters for mechanical bolts (This step includes the calculation of rock-load height, bolt length, bolt capacity and bolt spacing. Bolt length is calculated from the following equation: 946 L b = 0.65 h t The calculation of other...
Proceedings Papers

Paper presented at the The 28th U.S. Symposium on Rock Mechanics (USRMS), June 29–July 1, 1987
Paper Number: ARMA-87-0843
... wellbore integrity Engineering displacement convergence plastic zone tunnel Reservoir Characterization classification bolt density parameter tunnel convergence reduction bolt length displacement field Indraratna 28th US Symposium on Rock Mechanics / Tucson / 29 June- 1 July 198 7 Wall...
Proceedings Papers

Paper presented at the The 28th U.S. Symposium on Rock Mechanics (USRMS), June 29–July 1, 1987
Paper Number: ARMA-87-1137
.... More than 10 joints across the roadway brings the roof one more category lower - fair. 2.2.3 Calculation of the bolt length and spacing If the roof is considered very good, because it contains strong thick layers of sandstone or limestone with very few joints, a standard mechanical rock bolt pattern 5...
Proceedings Papers

Paper presented at the The 26th U.S. Symposium on Rock Mechanics (USRMS), June 26–28, 1985
Paper Number: ARMA-85-0011-1
... Reservoir Characterization displacement joint inclination rock slope protection Artificial Intelligence block model critical strain Model study relation cross joint discontinuity Upstream Oil & Gas platform slope angle determination aluminum bar bolt length bolt angle joint...
Proceedings Papers

Paper presented at the The 25th U.S. Symposium on Rock Mechanics (USRMS), June 25–27, 1984
Paper Number: ARMA-84-0857
... (SFA): The area of a key block's support face, its face on the excavation surface where supports are applied. reservoir geomechanics unstable area key block support force Reservoir Characterization MUKB support face area statistics bolt length Simulation productivity excavation...

Product(s) added to cart

Close Modal