ABSTRACT
ABSTRACT: Two SSC tunnels with a 46 foot vertical separation are connected by transfer tunnels which crisscross in a vertical plane in "bow-tie" fashion. Finite difference ground-structure interaction analyses are described, as well as the application of analysis results to design, and the close coordination with construction sequences and procedures.
This content is only available via PDF.
1994. A.A. Balkema - Permission to Distribute - American Rock Mechanics Association
You can access this article if you purchase or spend a download.