ABSTRACT:
The city of Sydney (Australia) is currently undergoing a major infrastructure construction boom, with numerous rail and road tunnels currently under construction. This paper presents the DFN modelling undertaken as part of the design process for the Parramatta and Wattle (PW) Caverns of the M4East project.
This content is only available via PDF.
2018. American Rock Mechanics Association
You can access this article if you purchase or spend a download.